{"id":1924,"date":"2026-07-21T06:42:13","date_gmt":"2026-07-21T06:42:13","guid":{"rendered":"https:\/\/maritimebizreview.com\/?p=1924"},"modified":"2026-07-21T06:54:15","modified_gmt":"2026-07-21T06:54:15","slug":"lamu-ports-moment-has-arrived-but-kenya-must-not-squander-it","status":"publish","type":"post","link":"https:\/\/maritimebizreview.com\/?p=1924","title":{"rendered":"Lamu Port&#8217;s Moment Has Arrived\u2014But Kenya Must Not Squander It"},"content":{"rendered":"<div dir=\"auto\">For years, the Port of Lamu was spoken of in the future tense\u2014a glittering US$2.5 billion bet on Kenya&#8217;s northern coastline that seemed perpetually trapped in master plans, policy papers, and ceremonial presidential groundbreakings. Between its commissioning in May 2021 and the end of 2024, the facility received fewer than 200 vessel calls, with some years recording only a handful of ships. Critics were quick to dismiss it as a costly &#8220;white elephant&#8221;\u2014a monument to ambition without the commercial traffic to justify the investment.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Today, that narrative has been decisively overturned.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The Port of Lamu is undergoing a remarkable transformation. In 2026 alone, it has already logged more than 120 vessel calls, while cargo throughput has surpassed 1.69 million metric tonnes. The growth trajectory defies expectations: volumes surged from just 74,380 metric tonnes in 2024 to 799,161 metric tonnes in 2025\u2014an astonishing 974 percent increase. This year, throughput has more than doubled again.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Perhaps the most powerful symbol of Lamu&#8217;s emergence was the arrival of the MV Baltimore Express, the 369-metre Hapag-Lloyd container vessel\u2014the largest ship ever to berth in East and Central Africa. That single call sent an unmistakable signal to the global shipping industry: Lamu has arrived.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">This is neither accident nor fleeting luck. It is the product of strategic planning, operational improvements, growing market confidence, and shifting geopolitical realities. As stakeholders from the Kenya Ships Agents Association (KSAA), Kenya Ports Authority (KPA), and international shipping lines concluded during their recent engagement in Lamu, the port stands at a defining crossroads.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The question is no longer whether Lamu can succeed.<\/div>\n<div dir=\"auto\">The question is whether Kenya is prepared to unlock its full potential.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>A Natural Advantage Finally Comes into Its Own<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Lamu&#8217;s greatest asset has always been its geography. With a natural harbor depth of 17.5 metres, the port can comfortably accommodate Post-Panamax and Ultra Large Container Vessels (ULCVs) without the costly, continuous dredging required elsewhere. While Mombasa remains Kenya&#8217;s principal gateway, its turning basin and physical limitations restrict the size of vessels it can safely handle.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Lamu was built for the future. Its deep-water berths and expansive turning basin can receive some of the world&#8217;s largest container ships\u2014vessels like the Nagoya Express and Baltimore Express that exceed the operational limits of most regional ports.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">As Lamu Port General Manager Captain Abdulaziz Mzee aptly put it: &#8220;Lamu was not built as an afterthought. It was built for vessels like these.&#8221;<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">That long-term vision is finally bearing fruit. Major global shipping lines\u2014including Hapag-Lloyd, CMA CGM, Maersk, and MSC\u2014are steadily expanding their presence at Lamu. The port is increasingly positioning itself as a regional transshipment hub serving Zanzibar, the Indian Ocean islands, Mozambique, Madagascar, and other emerging Western Indian Ocean markets.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">With Phase II adding three more berths\u2014bringing the total to six\u2014Lamu&#8217;s handling capacity is growing in step with rising demand.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>Geopolitics Has Accelerated the Opportunity<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Lamu&#8217;s recent success cannot be divorced from global maritime turbulence. The instability gripping shipping through the Red Sea and the Strait of Hormuz has disrupted traditional routes, forcing lines to rethink their logistics. Those disruptions have inadvertently boosted traffic to African ports, and Lamu has emerged as an unexpected beneficiary.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Pure Car and Truck Carriers (PCTCs)\u2014vessels that had never previously called at Lamu\u2014are now regular visitors, discharging thousands of vehicles diverted from Middle Eastern hubs like Jebel Ali.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">In many ways, geopolitics has given Lamu the international exposure that years of investment promotion alone could never have bought.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Yet this opportunity carries a sobering lesson: what geopolitics gives, geopolitics can take away. Once regional conflicts ease and traditional shipping corridors reopen, cargo owners will revert to prioritising efficiency, cost, and connectivity. Ports that fail to offer seamless inland logistics risk losing whatever temporary advantage they now enjoy.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>The Missing Link That Will Define Lamu&#8217;s Future<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Here lies Kenya&#8217;s greatest challenge.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">At the recent stakeholder forum, KSAA Chief Executive Officer Elijah Mbaru correctly identified the single most critical priority: accelerating investment in road and rail infrastructure connecting Lamu to Kenya&#8217;s interior, Ethiopia, and South Sudan.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The Port of Lamu was never designed to function as an isolated maritime facility. It was conceived as the maritime gateway of the Lamu Port-South Sudan-Ethiopia Transport (LAPSSET) Corridor\u2014a transformative regional programme spanning more than 3,000 kilometres of highways, railways, pipelines, and logistics infrastructure.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Yet much of that vision remains incomplete. Several strategic highways are unfinished; others have yet to break ground. The proposed Standard Gauge Railway linking Lamu to Isiolo\u2014estimated at roughly US$3.49 billion\u2014remains largely mired in feasibility studies and planning stages.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">History teaches us that building ports is often easier than building the transport corridors that make them commercially viable. Lamu may boast world-class berths and state-of-the-art marine infrastructure, but efficient cargo evacuation remains its Achilles&#8217; heel. Without reliable highways and rail links, even the most sophisticated port risks becoming an island of excellence\u2014disconnected from its hinterland.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>A National Asset, Not a Rival to Mombasa<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The commitment by KPA, KSAA, and industry stakeholders to jointly market Lamu is commendable. But marketing alone will not guarantee long-term success.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Kenya must abandon any lingering perception that Lamu and Mombasa are competitors. They are, and should be, complementary pillars of a single national maritime strategy. Mombasa should continue as the country&#8217;s primary gateway for domestic and regional cargo, while Lamu develops into East Africa&#8217;s premier deep-water transshipment hub\u2014capable of handling the world&#8217;s largest vessels.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">This functional specialisation would strengthen, not weaken, Kenya&#8217;s overall competitiveness.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The economic stakes extend far beyond our borders. A fully operational LAPSSET Corridor would diversify regional trade routes, reduce dependence on a single maritime gateway, stimulate growth across northern Kenya, and anchor the country as Eastern Africa&#8217;s dominant logistics hub. For Ethiopia, it offers a vital additional maritime outlet. For South Sudan, it provides a critical export corridor for oil and other commodities.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">These are not merely infrastructure projects. They are instruments of regional economic integration.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>The Time for Implementation Is Now<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">President William Ruto&#8217;s agreement with Ethiopia to utilise Lamu Port for imports reflects growing regional confidence in its strategic importance. International shipping lines are increasing their presence. Chinese port operators have expressed interest in cooperation, automation, and digital transformation. The Kenya Ports Authority continues to invest in modern cargo-handling equipment, automated cranes, and operational efficiency.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">These are important foundations\u2014but none will realise their full economic value without corresponding investment in the transport infrastructure that connects ships to markets. Ports do not create prosperity on their own. Integrated logistics systems do.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><strong>The Verdict<\/strong><\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The Port of Lamu has silenced its critics. It has proven it can attract the world&#8217;s largest vessels, handle millions of tonnes of cargo, and compete with the continent&#8217;s most modern maritime gateways.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">But its long-term success will not ultimately be determined at the quayside. It will be determined along the highways and railway corridors stretching westwards into northern Kenya, and onwards to Ethiopia and South Sudan.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">Without those strategic connections, today&#8217;s remarkable resurgence could fade into little more than a temporary spike\u2014driven by extraordinary global circumstances that are beyond our control. With them, however, Lamu has every chance to become one of Africa&#8217;s defining maritime success stories.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The stakeholders who gathered in Lamu this week recognised the opportunity. Now Kenya&#8217;s policymakers must demonstrate the urgency.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\">The port is ready. The ships are arriving. The only remaining question is whether the hinterland will be ready to receive them.<\/div>\n<div dir=\"auto\"><\/div>\n<div dir=\"auto\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>For years, the Port of Lamu was spoken of in the future tense\u2014a glittering US$2.5 billion bet on Kenya&#8217;s northern coastline that seemed perpetually trapped in master plans, policy papers, and ceremonial presidential groundbreakings. Between its commissioning in May 2021 and the end of 2024, the facility received fewer than 200 vessel calls, with some [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1925,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[68],"tags":[],"class_list":["post-1924","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lapsset"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lamu Port&#039;s Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maritimebizreview.com\/?p=1924\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lamu Port&#039;s Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review\" \/>\n<meta property=\"og:description\" content=\"For years, the Port of Lamu was spoken of in the future tense\u2014a glittering US$2.5 billion bet on Kenya&#8217;s northern coastline that seemed perpetually trapped in master plans, policy papers, and ceremonial presidential groundbreakings. Between its commissioning in May 2021 and the end of 2024, the facility received fewer than 200 vessel calls, with some [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maritimebizreview.com\/?p=1924\" \/>\n<meta property=\"og:site_name\" content=\"Maritime Business Review\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-21T06:42:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-21T06:54:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"270\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Andrew Mwangura\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Andrew Mwangura\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924\"},\"author\":{\"name\":\"Andrew Mwangura\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#\\\/schema\\\/person\\\/781b7dfa8057e582f58f7fe1301c0a4e\"},\"headline\":\"Lamu Port&#8217;s Moment Has Arrived\u2014But Kenya Must Not Squander It\",\"datePublished\":\"2026-07-21T06:42:13+00:00\",\"dateModified\":\"2026-07-21T06:54:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924\"},\"wordCount\":1262,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Roger-Dainty.jpg\",\"articleSection\":[\"LAPSSET\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924\",\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924\",\"name\":\"Lamu Port's Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Roger-Dainty.jpg\",\"datePublished\":\"2026-07-21T06:42:13+00:00\",\"dateModified\":\"2026-07-21T06:54:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#primaryimage\",\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Roger-Dainty.jpg\",\"contentUrl\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/Roger-Dainty.jpg\",\"width\":480,\"height\":270,\"caption\":\"KSAA Chairman Mr. Roger Dainty addressing a stakeholders\u2019 consultative meeting at Lamu Port. The meeting, held yesterday, brought together representatives from the Kenya Ports Authority (KPA), Kenya Ships Agents Association (KSAA), and international shipping lines to discuss key issues affecting port operations and maritime trade. Photo Credit: KSAA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/?p=1924#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maritimebizreview.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lamu Port&#8217;s Moment Has Arrived\u2014But Kenya Must Not Squander It\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#website\",\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/\",\"name\":\"Maritime Business Review\",\"description\":\"A Professional Maritime Blog for Advancing Africa\u2019s Maritime Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maritimebizreview.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#organization\",\"name\":\"Maritime Business Review\",\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/cropped-Gemini_Generated_Image_pmvqj6pmvqj6pmvq-removebg-preview-1.png\",\"contentUrl\":\"https:\\\/\\\/maritimebizreview.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/cropped-Gemini_Generated_Image_pmvqj6pmvqj6pmvq-removebg-preview-1.png\",\"width\":391,\"height\":121,\"caption\":\"Maritime Business Review\"},\"image\":{\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maritimebizreview.com\\\/#\\\/schema\\\/person\\\/781b7dfa8057e582f58f7fe1301c0a4e\",\"name\":\"Andrew Mwangura\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g\",\"caption\":\"Andrew Mwangura\"},\"sameAs\":[\"https:\\\/\\\/maritimebizreview.com\"],\"url\":\"https:\\\/\\\/maritimebizreview.com\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lamu Port's Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maritimebizreview.com\/?p=1924","og_locale":"en_US","og_type":"article","og_title":"Lamu Port's Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review","og_description":"For years, the Port of Lamu was spoken of in the future tense\u2014a glittering US$2.5 billion bet on Kenya&#8217;s northern coastline that seemed perpetually trapped in master plans, policy papers, and ceremonial presidential groundbreakings. Between its commissioning in May 2021 and the end of 2024, the facility received fewer than 200 vessel calls, with some [&hellip;]","og_url":"https:\/\/maritimebizreview.com\/?p=1924","og_site_name":"Maritime Business Review","article_published_time":"2026-07-21T06:42:13+00:00","article_modified_time":"2026-07-21T06:54:15+00:00","og_image":[{"width":480,"height":270,"url":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg","type":"image\/jpeg"}],"author":"Andrew Mwangura","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Andrew Mwangura","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maritimebizreview.com\/?p=1924#article","isPartOf":{"@id":"https:\/\/maritimebizreview.com\/?p=1924"},"author":{"name":"Andrew Mwangura","@id":"https:\/\/maritimebizreview.com\/#\/schema\/person\/781b7dfa8057e582f58f7fe1301c0a4e"},"headline":"Lamu Port&#8217;s Moment Has Arrived\u2014But Kenya Must Not Squander It","datePublished":"2026-07-21T06:42:13+00:00","dateModified":"2026-07-21T06:54:15+00:00","mainEntityOfPage":{"@id":"https:\/\/maritimebizreview.com\/?p=1924"},"wordCount":1262,"commentCount":0,"publisher":{"@id":"https:\/\/maritimebizreview.com\/#organization"},"image":{"@id":"https:\/\/maritimebizreview.com\/?p=1924#primaryimage"},"thumbnailUrl":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg","articleSection":["LAPSSET"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/maritimebizreview.com\/?p=1924#respond"]}]},{"@type":"WebPage","@id":"https:\/\/maritimebizreview.com\/?p=1924","url":"https:\/\/maritimebizreview.com\/?p=1924","name":"Lamu Port's Moment Has Arrived\u2014But Kenya Must Not Squander It | Maritime Business Review","isPartOf":{"@id":"https:\/\/maritimebizreview.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maritimebizreview.com\/?p=1924#primaryimage"},"image":{"@id":"https:\/\/maritimebizreview.com\/?p=1924#primaryimage"},"thumbnailUrl":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg","datePublished":"2026-07-21T06:42:13+00:00","dateModified":"2026-07-21T06:54:15+00:00","breadcrumb":{"@id":"https:\/\/maritimebizreview.com\/?p=1924#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maritimebizreview.com\/?p=1924"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maritimebizreview.com\/?p=1924#primaryimage","url":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg","contentUrl":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/07\/Roger-Dainty.jpg","width":480,"height":270,"caption":"KSAA Chairman Mr. Roger Dainty addressing a stakeholders\u2019 consultative meeting at Lamu Port. The meeting, held yesterday, brought together representatives from the Kenya Ports Authority (KPA), Kenya Ships Agents Association (KSAA), and international shipping lines to discuss key issues affecting port operations and maritime trade. Photo Credit: KSAA"},{"@type":"BreadcrumbList","@id":"https:\/\/maritimebizreview.com\/?p=1924#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maritimebizreview.com\/"},{"@type":"ListItem","position":2,"name":"Lamu Port&#8217;s Moment Has Arrived\u2014But Kenya Must Not Squander It"}]},{"@type":"WebSite","@id":"https:\/\/maritimebizreview.com\/#website","url":"https:\/\/maritimebizreview.com\/","name":"Maritime Business Review","description":"A Professional Maritime Blog for Advancing Africa\u2019s Maritime Industry","publisher":{"@id":"https:\/\/maritimebizreview.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maritimebizreview.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maritimebizreview.com\/#organization","name":"Maritime Business Review","url":"https:\/\/maritimebizreview.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maritimebizreview.com\/#\/schema\/logo\/image\/","url":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/01\/cropped-Gemini_Generated_Image_pmvqj6pmvqj6pmvq-removebg-preview-1.png","contentUrl":"https:\/\/maritimebizreview.com\/wp-content\/uploads\/2026\/01\/cropped-Gemini_Generated_Image_pmvqj6pmvqj6pmvq-removebg-preview-1.png","width":391,"height":121,"caption":"Maritime Business Review"},"image":{"@id":"https:\/\/maritimebizreview.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/maritimebizreview.com\/#\/schema\/person\/781b7dfa8057e582f58f7fe1301c0a4e","name":"Andrew Mwangura","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/27e344b81dad8a144aa02cf563c5dba9d6e20f37384170b4cbfa6b371f4c6a48?s=96&d=mm&r=g","caption":"Andrew Mwangura"},"sameAs":["https:\/\/maritimebizreview.com"],"url":"https:\/\/maritimebizreview.com\/?author=1"}]}},"_links":{"self":[{"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/posts\/1924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1924"}],"version-history":[{"count":2,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/posts\/1924\/revisions"}],"predecessor-version":[{"id":1930,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/posts\/1924\/revisions\/1930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=\/wp\/v2\/media\/1925"}],"wp:attachment":[{"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maritimebizreview.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}